Sealey SSCL3 User Manual
Page 5
Original Language Version
diagonal on the same frame on the second rung on the other
side. The last diagonal is to be placed on the top rung of the
second end frame
(WARNING : Make sure that everything is
the right way round as per the sketch!)
9.4 Before climbing within the frame, lock the wheels. Position
the end frames on to the folding base and lock the lower
diagonal B to the 5th rung of the base frame. Make sure that the
butterfly locking part is completely rotated to hold the diagonal
firmly in position. Put the 4 locking pins in place.
9.5 Position the 4 stabiliser legs G as per the heights indicated on
the sketch. Tighten firmly at the correct angle as shown above.
Note: Not all stabiliser legs illustrated.
9.6 Position platform H on the 5th rung from the bottom.
9.7 Climb through the trapdoor, sit on the edge and position the
two horizontal braces C on the 7th rung from the bottom and
the 2 braces C on the 9th rung. Lock the snaplocks firmly in
position.
9.8 Stand up on the platform and fix the 2 diagonals B hanging
from the frames into position.
9.9 Take 2 of the 6 rung end frames, F and 3 diagonals B. Position a
diagonal on the 4th rung of each frame but on opposite sides.
(WARNING : Make sure that everything is the right way round
as per the sketch!)
9.10 Position the end frames on to frame below and fix the 2 diagonals
B hanging from the frames into position. Make sure that the
butterfly locking part is completely rotated to hold the diagonal
firmly in position. Insert the frame locking pins.
9.11 Position a platform H on the 11th rung and lock in place.
9.12 Climb through the trapdoor, sit on the edge and position the two
horizontal braces C on the 13th rung from the bottom and the 2
braces C on the 15th rung. Lock the snaplocks firmly in position.
9.13 Attach a diagonal B onto the lower rung of one of the two-rung
guardrail end frames D.
9.14 Position the first two-rung guardrail end frame D (without the
diagonal) on the base and then put the two-rung guardrail end
frame D already equipped with the diagonal on the other side of
the base. Fix the diagonal in place on the 17th rung. Make sure
that the butterfly locking part is completely rotated to hold the
diagonal firmly in position. Insert the frame locking pins.
9.15 Climb down to the lowest platform and sitting in the access hatch
remove the 4 horizontal braces from rungs 7 and 9 and pass
them to the ground.
9.16 Climb to the ground and remove the lower platform.
9.17 Ascend to the platform on rung 11 and reposition the other
platform on the 18th rung from the bottom. Lock the windlocks
securely.
9.18 Climb through the trapdoor, sit on the edge and position the two
lower horizontal braces C on the 2nd rung from the top. Lock the
snaplocks firmly in position . Remaining seated in the same
position, put the other two rails C into position on the top-most
rungs. Lock the snaplocks firmly into position.
9.19 Lastly install the toeboards E.
Lock all wheels prior to using the scaffold; ensure that the
stabiliser legs are secure and firmly seated on the ground.
SSCLI + SSCL3 + SSCL4
NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.
IMPORTANT: No liability is accepted for incorrect use of this product.
WARRANTY: Guarantee is 12 months from purchase date, proof of which will be required for any claim.
INFORMATION: For a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.
01284 757500
01284 703534
Sole UK Distributor, Sealey Group,
Kempson Way, Suffolk Business Park
,
Bury St. Edmunds, Suffolk,
IP32 7AR
www.sealey.co.uk
Web
SSCLI + SSCL3
SSCL1.V2, SSCL3, SSCL4 - 1 - 17/09/10