Sscl4 (contents), Sscl4 (assembly) – Sealey SSCL3 User Manual
Page 4

8. SSCL4 (CONTENTS)
Original Language Version
9. SSCL4 (ASSEMBLY)
NOTE: The mobile scaffold tower may only be assembled, used
and dismantled by persons familiar with these Assembly and Use
Instructions.
NOTE: These instructions show the assembly of SSCL1 +
SSCL3 + SSCL4 from scratch. If you already have SSCLI +
SSCL3 assembled it will be necessary to partly disassemble
some of the upper parts so that it resembles diagram No.8
below. The parts removed will be reused in the assembly of
the extended tower.
9.1 Open folding base A and insert the locking pin in the centre of
the folding section. Place diagonal B on one side on the first
rung and on the 4th rung on the other side. Make sure that the
butterfly locking part is completely rotated to hold the diagonal
firmly in position.
9.2 Place horizontal brace C on the first rung and lock in position.
9.3 Take 2 of the 6 rung end frames, F and 3 diagonals B. Position a
diagonal on the topmost rung of one frame and the second
SSCL1.V2, SSCL3, SSCL4 - 1 - 17/09/10