beautypg.com

Sscl3 (assembly), Sscl3 (contents) – Sealey SSCL3 User Manual

Page 3

background image

7. SSCL3 (ASSEMBLY)

6. SSCL3 (CONTENTS)

Reference

Description

Quantity

B

Diagonal Brace

2

C

Horizontal brace

4

H

Trapdoor Platform

1

F

6 Rung End Frame

2

G

Stabiliser Leg

4

Original Language Version

NOTE: The mobile scaffold tower may only be assembled, used

and dismantled by persons familiar with these Assembly and Use

Instructions.

NOTE: These instructions show the assembly of SSCL1 +

SSCL3 from scratch. If you already have SSCLI assembled it will

be necessary to partly disassemble some of the upper parts so

that it resembles diagram No.2 below. The parts removed will be

reused in the assembly of the extended tower.

7.1 Open folding base A and insert the locking pin in the centre of

the folding section. Place diagonal B on one side on the first rung

and on the 4th rung on the other side. Make sure that the

butterfly locking part is completely rotated to hold the diagonal

firmly in position.

7.2 Place horizontal brace C on the first rung and lock in position.

7.3 Take the two 6 rung end frames, F and 3 diagonals B. Position

a diagonal on the topmost rung of one frame and another

diagonal on the second rung of the same frame but on the other

side. The last diagonal is to be placed on the top rung of the

second end frame. Make sure that the butterfly locking part is

completely rotated to hold the diagonal firmly in position.

(WARNING : Make sure that everything is the right way

round as per the sketch!).

7.4 Before climbing within the frame, lock the wheels. Position

the end frames on to the folding base and lock the lower

diagonal B to the 5th rung of the base frame. Make sure that

the butterfly locking part is completely rotated to hold the diagonal

firmly in position. Put the 4 locking pins in place to hold the

frames to the base.

7.5 Position the 4 stabiliser legs G as per the heights indicated on the

sketch. Tighten firmly at the correct angle as shown above. Note:

Not all stabiliser legs illustrated.

7.6 Position platform H on the 5th rung from the bottom

7.7 Climb through the trapdoor, sit on the edge and position the two

horizontal braces C on the 7th rung from the bottom and the 2

braces C on the 9th rung. Lock the snaplocks firmly in position.

7.8 Stand up on the platform and fix the 2 diagonals B hanging from

the frames into position. Make sure that the butterfly locking part

is completely rotated to hold the diagonal firmly in position.

7.9 Put the two 2-rung guardrail end frames D into position. Slide

them onto the frames beneath and secure with locking pins.

7.10 Place a platform H on the 12th rung from the bottom. Climb

through the access hatch, sit on the edge and position the two

horizontal braces C on the 2nd rung from the top.

7.11 Remaining seated in the same position, put the other two rails C

into position on the top-most rungs. Lock the snaplocks firmly in

position.

7.12 Lastly install the toeboards E.

Lock all wheels prior to using the scaffold; ensure that the

stabiliser legs are secure and firmly seated on the ground.

SSCL1.V2, SSCL3, SSCL4 - 1 - 17/09/10

This manual is related to the following products: