beautypg.com

Built-in fireplace installation – Empire Comfort Systems VFHS-20/10T-4 User Manual

Page 11

background image

Page 11

16717-2-0605

Built-In Fireplace Installation

Built-in installation of this fireplace involves installing fireplace

into a framed-in enclosure. This makes the front of fireplace flush

with wall. If installing a mantel above the fireplace, you must follow

the clearances shown in Figure 5, page 9. Follow the instructions

below to install the fireplace in this manner.
Frame in rough opening. Use dimensions shown in Figure 10 for a

conventional rough opening. Use dimensions shown in Figure 11

for corner rough opening. Be sure to provide gas line for fireplace

and electrical power for VFS-BK optional blower assembly.
1. Attach two (2) nailing flanges to firebox sides with two (2) 10

x 1/2" screws for each nailing flange.

2. Gas line connections must be made at this time. When facing

the appliance the gas supply will enter on right-hand side. See

"Gas Supply" Page 8.

3. Insert fireplace into enclosure.

4. Attach nailing flanges to framing with a screw or nail.

5. Finished wall surface will be flush to the leading edge of

fireplace top and sides.

6. Installation of built-in fireplace is completed.
Installation of Brass Trim

1. Lower bottom louver.

2. Remove screen from fireplace.

3. Remove top louver from fireplace [two (2) Phillips screws].

4. Attach right and left brass trim, sides to fireplace. Use two (2)

Phillips screws for each side.

5. Attach brass trim top to fireplace with two (2) Phillips

screws.

BUILT-IN FIREPLACE INSTALLATION

Rough Opening for Installing in Wall ( Figure 10)

Figure 10

Figure 12

Rough Opening for Installing in Corner ( Figure 11)

Figure 11

This manual is related to the following products: