Installation 1-3

Installation Check Sheet

The following is a quick reference guide to the installation and configuration of the E7 drive with the APOGEE FLN protocol. Make a
copy of this page and check-off each item as it is completed. For detailed information please refer to the detailed sections that follow.

1:

Unpack the drive and verify that all components are present and undamaged.

2:

Connect power to the drive and verify that the drive functions. This includes running the drive in “Hand” mode from the
digital operator without the network selected or connected. Refer to the E7 User Manual for more information on
connecting and operating the drive.

3:

Remove power from the drive and wait for the charge lamp to be completely extinguished. Wait at least five additional
minutes after all indicators are off. Measure the DC bus voltage to ensure that the drive is at a safe level and completely
discharged.

4:

Connect the drive to the APOGEE FLN communication network. Refer to Chapter 2 – Network Connection for the
APOGEE FLN connection procedure.

5:

If this drive is either the first or the last device on the network, set the terminating resistor switch, S1-1, to ON. If this
device is not the first or last device on the network, set the terminating resistor switch, S1-1, to OFF. Refer to Chapter 2 –
Network Connection
for details.

6:

Configure the APOGEE FLN network for the drive. Refer to the documentation included with the APOGEE FLN
Application 2721 configuration software.

7:

Set parameters b1-01, b1-02, H5-01, H5-02 and H5-08 to their appropriate values. Refer to Table 1.1 - Drive
Communication Parameter Settings
on page 1-5.