beautypg.com

Symbol import procedure, Function block startup procedure – Yaskawa MP2300 User Manual

Page 9

background image

MP2300 Quick Reference Guide Rev1.5

Function Block Startup Procedure

First complete the MP2300 Startup Procedure
There should be a new controller folder

Step Instruction

Detail

1

Acquire project file

FB040823.MAL or equivalent. Download to C:\ or any directory without
spaces.

3

Extract MAL file to
controller files on
hard drive*

R-click Controller folder, Transfer, Selected Files, From Another Drive to
MPE720. Find *.MAL file. *Check the FUNC box. Then click "transfer"
button. Takes about 30 seconds. Close window when complete.

4

Transfer Function blocks
to Controller*

R-Click controller folder, Transfer, Selected Files, From MPE720 to
Controller. *Check the FUNC box. Then click "transfer" button. Transfer
takes almost 4 minutes with serial connection.
Close window when complete.

5

Save to Flash

Click the Black Diskette Icon. When the window pops up, click the leftmost
button (Compar/save) and accept other defaults. Close window when
complete.

6

Save to Hard Disk

R-Click controller, Transfer - All files - From Controller to MPE720. Uncheck
registers or it will take over 7 minutes.*

7

Cycle Power

Cycle power is needed for initialization drawings (A drawings) to run

*

To start a totally blank Function Block project, only check FUNC box and all detail. To start with the pre-
made Function Block template, check both DWG and FUNC and under each detail select "all".

Log ON (online)

2

R-Click Controller folder, Log OFF. R-Click controller folder, check "online".
Double-click Controller folder to log on. The default User Name and
Password are both USER-A

Page 9 of 14