beautypg.com

Dvvk-4fv direct vent termination kit (cont.) – Empire Comfort Systems DVX36DP31 User Manual

Page 22

background image

25613-0-0309

Page 22

10. With the flex vent assembly and the 48” long hard pipe com-

ponents laid out on the floor, begin securing these parts to-

gether. First, apply a generous bead of silicone sealant to the

inside of the 4” diameter flex flue (not the end with the pre-

installed connector), then slide the flex flue over the 4” diam-

eter hard pipe flue. Be sure to overlap at least 1-1/4”. Secure

this connection with a 4” diameter band clamp provided. Be

careful not to damage or tear the flex flue when tightening

clamp.

11. Repeat the connection process for the outer 7” diameter flex

vent to hard pipe connection. Use silicone sealant at this joint

also, overlap at least 1-1/4”, then secure the joint with the 7”

diameter band clamp provided. Be careful not to damage or

tear the flex vent pipe when tightening the clamp.

12. While the venting is still on the floor, assemble the roof jack

components as shown in Figure 31 and pre-install the roof

jack assembly to the hard pipe approximately 18” from the

top end of the hard pipe.

13. Now the pre-assembled vent system may be carried to the

roof, then lowered through the roof cutout opening (see step

5). Feed the flex vent end down through the roof opening and

firestop/thimble assembly installed in steps 4 through 6.

14. Secure the roof support assembly to the roof sheathing with

at least (4) nails/screws through each support bracket. Check

that the combustible clearances through the roof framing will

maintain at least a 1” clearance from the vent pipe.

15. Determine how high the vent terminal should be located

above the roof line based on the roof pitch information shown

in Figure 33. Adjust the vent system height by loosening the

pre-installed roof support pipe clamp and sliding the vent

pipe up or down as pre-determined, then re-tighten the pipe

clamp. Install a couple of sheet metal screws through the pipe

clamp into the outer hard vent pipe to lock in place.

16. Check to make sure that the bottom end of the flex vent is

long enough to reach the fireplace adapter collars. If too long,

trim off the extra flex vent not needed.

NUT (2)

SCREW (2)

PIPE CLAMP

ROOF BRACKET (2)

WING NUT (2)

H

X

12

VENT CAP

GAS VENT

LOWEST

DISCHARGE

OPENING

ROOF PITCH IS X/12

H (Min.) - Minimum height from

roof to lowest discharge opening

Figure 31

Figure 33

ROOF PITCH

H (Min.)

Flat to 6/12

12” (305 mm)

6/12 to 7/12

15” (381 mm)

Over 7/12 to 8/12

18” (457 mm)

Over 8/12 to 16/12

24” (610 mm)

Over 16/12 to 21/12

36” (914 mm)

DVVK-4FV DIRECT VENT TERMINATION KIT (cont.)

Figure 32

When terminating the vent cap near an exterior wall or overhang,

maintain minimum clearances as shown in Figure 32.

This manual is related to the following products: