6 Commissioning

Installation Guide

Ukonstanter-IEN103610

23

6 Commissioning

Requirements for Commissioning

☐ There is a protective conductor connection between the voltage stabilizer and the

Sunny Central.

☐ All screws and cable glands are tight.
☐ The line circuit breaker is working properly.

The voltage stabilizer is started up as soon as the Sunny Central is started up.

Sunny Central Installation Manual

Follow all instructions in the Sunny Central installation manual.