7 commissioning, 1 commissioning procedure, 2 changing the display language – SMA SB 1300TL User Manual
Page 35: Commissioning, Commissioning procedure, Changing the display language, 7commissioning
7
Commissioning
7.1
Commissioning Procedure
Procedure
See
1.
Connect to the communication interface.
Installation manual of the com-
munication interface
2.
If the display language is not set correctly, adjust the set-
tings.
3.
Commission the inverter and start a self-test, if required.
Section 7.3, page 36 and
Section 7.4, page 37
7.2
Changing the Display Language
Use the following figure to check whether the display language of the inverter is set correctly. If the
display language is not correct, you can change the display language of the inverter as described
in the following. Various languages are available depending on the country data set selected.
Figure 11: Switch for setting the display language
Language
Switch S2
Switch S1
German
B
B
English / Italian*
B
A
French
A
B
Spanish / English**
A
A
* When country data set CEI 0-21 is selected, the language is Italian.
** When country data set CEI 0-21 is selected, the language is English.
Procedure:
1.
Danger to life due to electric shock
• Ensure that the inverter is disconnected from all voltage sources (see Section 10
"Disconnecting the Inverter from Voltage Sources", page 46).
7 Commissioning
SMA Solar Technology AG
Operating Manual
35
SB13-21TL-BE-en-11