beautypg.com

SMA POWER BALANCER User Manual

Page 24

background image

Wiring

SMA America, LLC

24

SBUS-PowBal-IUS102810

Installation Guide

20. Plug the spring clamp male connector (B) to the three-pole terminal block (A).
21. Install the jumper to the middle inverter

on position (1) of the jumper slot.

Connecting the shield wire at the 2 outside inverters

22. Connect the shield flat connector (B) of the

Power Balancer cable to the grounding flat pin (A).

23. Close all 3 inverters as described in the Sunny Boy installation guide.

Position

Description

A

Grounding flat pin

B

Shield flat connector