Linking the 3 inverters at the middle inverter – SMA POWER BALANCER User Manual
Page 23
SMA America, LLC
Wiring
Installation Guide
SBUS-PowBal-IUS102810
23
Linking the 3 inverters at the middle inverter
11. Open the middle inverter as described in the Sunny Boy installation guide.
12. Remove 2 filler plugs on the bottom right of the middle inverter.
13. Insert cable glands into each opening and fasten
each with a lock nut.
14. Unscrew the cap nut of the installed cable glands a bit.
15. Thread the Power Balancer cables from the 2 outside inverters through the cable glands into the
middle inverter.
Only use 1 cable gland per cable.
16. Draw each cable up to the three-pole terminal block (A).
17. Tighten the cap nut of each cable gland in order to secure the Power Balancer cable.
18. Insert the conductors of both Power Balancer
cables into 1 spring clamp male connector.
– Both red conductors into the middle terminal.
– Both blue conductors into the right terminal.
– The left terminal remains unused.
19. Close all clamp terminals by pushing down the
levers.
- SUNNY PORTAL (75 pages)
- SB 2.5-1VL-40 (60 pages)
- SB 2.5-1VL-40 Service Manual (36 pages)
- SB 240 (78 pages)
- FLX Pro 17 (12 pages)
- FLX Series GSM Option Kit (48 pages)
- FLX Series Sensor Interface Option (51 pages)
- FLX Series PLA Option (62 pages)
- FLX Series (248 pages)
- 25000TL (52 pages)
- 25000TL Installation (40 pages)
- 25000TL Service Manual (46 pages)
- CBL-DC-CMB8-10 (24 pages)
- 25000TL Quick Installation Guide (36 pages)
- STP 60-10 Replacing a Defective Fan (12 pages)
- STP 60-10 Replacing Defective Surge Arresters (12 pages)
- Webconnect Systems in SUNNY PORTAL (69 pages)
- STP 12000TL (68 pages)
- STP 60-US-10 Installation (232 pages)
- 485 Data Module Type B (24 pages)
- STP 12000TL Quick Installation Guide (28 pages)
- 1000-US (52 pages)
- STP 24000TL-US (78 pages)
- STP 17000TL (60 pages)
- STP 20000TL (2 pages)
- SB 6000TL Service Manual (46 pages)
- MULTIFUNCTION RELAY (32 pages)
- SB 5000TL (60 pages)
- SB 5000TL Quick Installation Guide (32 pages)
- FANKIT01-10 (24 pages)
- SB 7700TL-US (28 pages)
- FANKIT02-10 (24 pages)
- SB 7700TL-US Installation (96 pages)
- SUNNY MINI CENTRAL (48 pages)
- DC Disconnect Switch For SB 3800-U (32 pages)
- SB 4000-US (100 pages)
- DB-DC-DISCON (4 pages)
- SB 3800-U (86 pages)
- SB 8000-US (104 pages)
- SB 11000TL‑US (40 pages)
- SMC 11000TL (24 pages)
- SBCBTL6 (36 pages)
- SB 11000TL‑US Installation (92 pages)
- SMC 11000TL Installation (96 pages)