Wiring

SMA America, LLC

20

SBUS-PowBal-IUS102810

Installation Guide

15. Connect the conductors of both Power Balancer

cables to the screw terminal block.
– Both red conductors to terminal +.
– Both blue conductors to terminal − .

16. Install the jumper to the middle inverter

on position (1) of the jumper slot (B).

Connecting the shield wire at the 2 outside inverters

17. Connect the shield flat connector (B) of the

Power Balancer cable to the grounding flat pin (A).

18. Close all 3 inverters as described in the Sunny Boy

installation guide.

Position

Description

A

Grounding flat pin

B

Shield flat connector