ShoreLand'r SRB68TCBB User Manual
Page 5

end of the tongue brake hose into the port of the
solenoid. Tighten.
Align the holes in the actuator with the holes in the
tongue. Secure the actuator to the tongue using three
(3) 1/2” x 4 1/2” hex bolts and lock nuts. Tighten.
Thread the brass coupling provided on the other end
of the brake hose just installed. Align so it can be
mated to the brake hose from the side frame. Once
aligned thread the side frame brake hose into the
other end of the coupling. Tighten both hoses into the
coupling.
This 42” winch post assembly will be
used on the bunk trailer only.
Winch Post Assembly (Will be used on
both assemblies.)
Mount the winch post assembly to the
tongue in a location that will best fit your
boat. Secure the winch post base weldment
(Ref. 2) to the tongue using (2) 1/2” x 3-9/16’
x 5” U-bolts and hex lock nuts. Attach the
winch post tube weldment to the base just
installed with a 1/2” x 4-1/2” hex bolt and hex
lock nut. Tighten only enough to hold the
assembly in position until the boat is
positioned on the trailer. Snap the winch
handle on the winch by compressing the
spring loaded clip incorporated in the handle.
Once in position, release the clip. Handle is
secure.
Midwest Industries, Inc.
Ida Grove, IA 51445
800.859.3028
www.shorelandr.com
0004361
Page 5 of 14
4/29/2011