Emerson Process Management 760004-A User Manual
Model nga 2000 hfid, Heated flame ionization detector module
Table of contents
Document Outline
- Model NGA 2000 Heated Flame Ionization Detector Module
- Preface
- 1-0 Description and Specifications
- 2-0 Installation
- 3-0 Operation
- 4-0 Maintenance and Service
- 5-0 Troubleshooting
- 6-0 Replacement Parts
- 7-0 Return of Material
- 8-0 Appendix A - Menu Displays
- Warranty
- Emerson Process Management - Worldwide
- Figures
- 1-1 Flame Ionization Detection Technology
- 1-2 Heated Flame Ionization Detector Analyzer Module - Top View
- 2-1 Back Panel Connections
- 2-2 Flow Diagram
- 2-3 Front Panel Electrical Connections
- 2-4 Front Panel Connections, Controls and Indicators
- 2-5 HFID Outline and Mounting Dimensions
- 2-6 HFID Wiring Diagram
- 3-1 Typical Curves of Module Response vs. Pressure Setting on Fuel Pressure Regulator
- 3-2 Typical Curves of Module Response vs Pressure Setting on Air Pressure Regulator
- 3-3 Front Panel Torque Sequence
- 4-1 Removal of Cover and Insulation Shield
- 4-2 Locations of Major Assemblies of the HFID
- 4-3 Removal of Oven from Chassis
- 4-4 Oven Assembly
- 4-5 Burner - Sensor, Flameout Detector, RTD Detector and Igniter
- 4-6 Burner/Thermal Block Disassembly
- 4-7 Burner Disassembly
- 4-8 Burner Jets
- 4-9 Thermal Block - Sample RTD, Cartridge Heater and Thermostat
- 4-10 Thermal Block Assembly
- 4-11 Removing Electronics Assembly From Chassis
- 4-12 Electronics Assembly - Exploded View
- 4-13 Case Sensor Installation
- 4-14 Case Pressure Purge Switch Installation
- 4-15 Preamp Assembly Installation
- 4-16 Fan Assembly Installation
- 4-17 Flow Controller Replacement
- 4-18 Flow Controller Assembly
- 4-19 DC Power Supply Module Replacement
- 4-20 Front Panel - Exploded View
- 4-21 Accessing Front Panel Components
- 4-22 Rear Panel Components
- Tables