beautypg.com

ShoreLand'r SL30BAL User Manual

Page 12

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

(800)859-3028

www.shorelandr.com

M301237

REV A 9/18/03

Page 12

R Series
Place the roller arm assembly mounting channel over the rear cross
member and secure with a 1/2” x 4-1/4” hex bolt and lock nut. (See
Detail M, Page 6). The roller arm asssembly should be left loose
until the boat is placed on the trailer for adjustment. Once the position
is determined, tighten. Repeat on the other roller arm assembly.

The short stabilizer bunk is installed to the adjustable bunk bracket
on the front cross member with a 3/8” x 1” hex bolt and lock nut.
(See Detail O, Page 7).