beautypg.com

ShoreLand'r SL30BAL User Manual

Page 7

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

(800)859-3028

www.shorelandr.com

M301237

REV A 9/18/03

Page 7

RB Series
Place the RB arm assembly mounting channel over the rear cross member and secure with a 1/2” x 4-1/4” hex bolt and lock
nut. (See Detail N). The RB assemby should be left loose until the boat is placed on the trailer for
adjustment. Once the position is determined, tightened. Repeat on the other RB arm assembly.

The short stabilizer bunk is mounted to the adjustable bunk bracket on the front cross member with a 3/8” x 1” hex bolt and
lock nut. (See Detail O).