ShoreLand'r SL60T User Manual
Page 9

Made in the USA
Midwest Industries, Inc. Ida Grove, IA 51445 800.859.3028
0002998
Page 9
www.shorelandr.com
REV
02/08/01
Align the center hole of the rocker (6239210) with the center
hole of the spring bracket. Insert and secure with a 3/4” X 4-
1/2” hex bolt from the outside in and tighten with a 3/4” hex
lock nut.
Rocker Bogie:
Note: Make certain the hook end of the springs point in the
same direction to the rear of the trailer, on both axles! For the
rear spring and axle - place a S-3207G, galvanized spring
bracket bushing, in the rear of the spring bracket. Insert the
9/16” X 3-1/4” hex bolt through the bracket from the outside
in and tighten with a 9/16” hex lock nut. Slide the end of the
hook spring over the bushing; raise the front of the spring
and fasten with a 9/16” X 3-1/4” hex bolt and 9/16” hex lock
nut. Repeat on the opposite side of the axle.
For installation of the front spring and axle repeat the previ-
ous procedure, however, place the bushing in the rocker box
in the hook end of the spring. Insert the bolts and secure with
9/16” lock nuts as before.
Mount the tire and rim assemblies using 80-90 lbs. of torque
on the lug nuts using a proper tightening apparatus or tool.
Axles:
Refer to the Brake Service Manual for service and mainte-
nance.
Brakes: