background image

26

Installation

A

SSEMBLY

AND

I

NSTALLATION

OF

I

NSERT

S

URROUND

P

ANELS

:

To assemble the surround panels, lay the panels face down on a soft

flat surface and align the outer edges of the sides with the top panel.

Using four T20 screws up through the side panels into the top (see

top left figure).

����

I

NSTALLATION

AND

R

EMOVAL

OF

C

ONTROL

P

ANEL

IN

T

HE

S

URROUND

P

ANEL

:

When installing the circuit board control panel into the surround panel, the surround does not need to be assembled

The circuit board will be found in the firebox.

Place the circuit board control panel on the backside of the right

surround panel so the hinge is on the outside and the top and

bottom holes on the control panel line up with those on the

surround. Attach using two T20 screws through the front of the

surround into the circuit board control panel.

After the surround has been assembled and is ready to be installed

on the the unit plug the wiring harness into the control panel (see

top left figure).

REMOVAL:

When maintenance is required on the unit the surround must be

removed. Pull the surround straight up till it stops then pull it out

about 4” (10cm) and rest the surround on top of the unit while the

control panel is removed or disconnected.

If electrical connection is required for the maintenance remove

the circuit board control panel from the surround.

If electrical connection is not required for the maintenance remove

the wiring harness from the bottom of the circuit board control.

Place the assembled surround panel around the

stove; align the slots with the screw heads. Push

surround in then down to engage the surround

slots on the mounting screws (see right). Make

sure the top surround panel sits flat behind the

stove top.