beautypg.com

Installation – Enviro Meridian C-10135 User Manual

Page 18

background image

Installation

T

HROUGH

W

ALL

W

ITH

V

ERTICAL

R

ISE

I

NSTALLATIONS

:

Wall framing

Wall thimble

Termination cap

Vent pipe

Horizontal frame

for thimble

������ ��������

Wall framing

Wall thimble

Termination cap

Vertical section

of vent pipe

Horizontal frame

for thimble

Clean out tee

90 deg elbow

������ ��������

Concrete Wall

Wall framing

Wall thimble

Termination cap

Vertical section

of vent pipe

Horizontal frame

for thimble

Clean out tee

90 deg elbow

������ ��������

Wall strap

S

TRAIGHT

T

HROUGH

W

ALL

I

NSTALLATIONS

:

The termination must be 12 inches (30 cm) from the

outside wall and 12 inches (30 cm) above the ground.

A 45° elbow with a rodent screen may be used in place

of the termination cap (or stainless steel termination

hood).

Installation to use if there is a concrete or retaining wall

in line with exhaust vent on pellet stove.

The termination must be 12 inches (30 cm) from the

outside wall and 12 inches (30 cm) above the ground.

This is the recommended installation set up.

A 45° elbow with a rodent screen may be used in place of the termination cap (or stainless steel

termination hood).

18