2 machine switch-on, 2 mac h ine s w itc h -on 1.2 machine switch-on – HEIDENHAIN TNC 320 (340 55x-05) User Manual
Page 37

HEIDENHAIN TNC 320
37
1
.2 Mac
h
ine S
w
itc
h
-On
1.2 Machine Switch-On
Acknowledge the power interruption and move
to the reference points
U
Switch on the power supply for control and machine. The TNC starts
the operating system. This process may take several minutes. Then
the TNC will display the message "Power interruption."
U
Press the CE key: The TNC converts the PLC
program
U
Switch on the control voltage: The TNC checks
operation of the emergency stop circuit and goes into
the reference run mode
U
Cross the reference points manually in the displayed
sequence: For each axis press the machine START
button. If you have absolute linear and angle encoders
on your machine there is no need for a reference run
The TNC is now ready for operation in the Manual Operation mode.
Further information on this topic
Traversing the reference marks: See "Switch-on" on page 368
Operating modes: See "Programming and Editing" on page 63
Switch-on and crossing the reference points can vary
depending on the machine tool. Your machine manual
provides more detailed information.