Chapter 3 servicing the level 3 raid – Grass Valley K2 Level 3 RAID Dec.09 2005 User Manual
Page 40

40
Level 3 RAID Instruction Manual
November 23, 2005
Chapter 3 Servicing the Level 3 RAID
.
.
Flash
On
Off
The controller is being booted
Flash
Busy
flashing
Busy flashing
Firmware is being updated automatically
Flash
(synchronized
with Fault
LED)
Off
Flash
(synchronized
with SVP
LED)
Download mode
Busy flashing
Flash
Off
Online downloading is being executed through
maintenance PC.
HL0/1
HA0/1
Meaning
On
Off
The host Fibre Channel link-up is being executed
Off
Off
The host FIbre Channel link-down is being
executed
Flash
Flash
Host Fibre Channel port offline
Flash twice
in 2 sec.
Flash twice in
2 sec.
Wait for setting for host Fibre Channel port
DL0/1
Meaning
On
The Fibre Channel link-up is being executed on the
Expansion chassis
Off
The Fibre Channel link-down is being executed on
the Expansion chassis
DISKLINK
Meaning
On
The Fibre Channel link-up is in progress on the
internal Ezpansion Chassis side
Off
The Fibre Channel link-down is in progress on the
internal Ezpansion Chassis side
MC ACD LED
(ACS)
Meaning
On
SD card is being accessed
SVP
LED
DIR
LED
FLT LED
Meaning