Adding xg events to an itx schedule, Adding xg events to an itx schedule -18, Adding an xg event to the schedule grid – Grass Valley Vertigo XG Integration v.2.3 User Manual
Page 48

3-18
Vertigo XG & iTX Integration User Guide
VertigoXG Plugin: Adding XG Events to a Schedule
Adding XG events to an iTX schedule
XG events are secondary events in a schedule that allow Vertigo graphics pages and scenes
to be played out on a specified keyer layer.
You can add XG events to the iTX channel’s schedule by either adding a page or scene to
the Schedule Grid or to the Timeline.
N
OTE
The VertigoXG Palette uses the term “Page” for both Vertigo pages and scenes. For example,
the Selection pane lists both pages and scenes, but the column heading is Page Name.
Adding an XG event to the schedule grid
Figure
demonstrates that once pages (Vertigo page and/or scene assets) are listed in
the Vertigo XG palette, you can drag a page/scene from the Selection pane directly onto a
primary event on the channel’s Schedule Grid. This adds the page/scene as a secondary
event of type XG. The page/scene’s default duration value and default keyer value are used
for the event’s Duration and Keyer settings, but they can be edited directly in the Schedule
Grid or using the Event Editor (see
Figure 3-11. Drag the page/scene onto a primary event in the schedule
Vertigo pages/scenes are added as secondary events of type XG