Repacking the blackdiamond 12802 chassis – Extreme Networks BlackDiamond 12804 User Manual
Page 129
![background image](/manuals/79600/129/background.png)
Repacking the BlackDiamond 12802 Chassis
BlackDiamond 12800 Series Switches Hardware Installation Guide
129
Repacking the BlackDiamond 12802 Chassis
To repack the BlackDiamond 12802 chassis for return to Extreme Networks:
1
Prepare the shipping box. Remove saved packing materials except the lower foam cushion, which
should be in the bottom of the box.
2
Remove all modules and power supplies from the chassis. Follow correct Extreme Networks
procedures for removing components from the BlackDiamond chassis.
3
Remove the chassis from the equipment rack as follows:
a
Loosen and remove the eight mounting screws holding the chassis to the rack.
b
Guide the chassis out of the rack and set it on a secure, flat surface.
4
Remove the rack-mounting brackets.
5
Place the chassis into the shipping bag.
6
Carefully set the chassis onto the foam cushion in the bottom of the shipping carton (see
Figure 86: Packing the BlackDiamond 12802 Chassis
7
Set the top foam cushion in place over the chassis (see
8
Close the top flaps and seal them securely with packing tape.
BlackDiamond
12802 switch
BD_150