11 Server installation and initial setup
The steps for installation and network configuration of the K2 Edge nodes are:
1) Place the servers in the rack and connect cables and IOs.
2) Configure the IP Manager.
3) Configure the K2 Edge network settings via the IP Manager web interface.
4) Select a preset for Channel configuration.
5) If applicable, configure time settings.
6) If applicable, configure licenses.
11.1 Connecting the server to the LAN and connecting the IP Manager
Following cables must be connected:
Network cable LAN
Connect to
eth0
Network cable for the IP Manager
Connect to
IPM
11.2 Connecting the IOs
IO1-IO8
Note that presets are defined for port configuration [see chapter
12]. Bypass can be enabled on IO1 (in) and IO2 (out).
11.3 Connecting the VGA-monitor (optional)
VGA-monitor (console)
Connect to
VGA
Keyboard (console)
Connect to
KBD
11.4 Connecting blackburst, GPIO and LTC (optional)
Blackburst
Connect to
GL
GPIo
Connect to
GPIo [see the appendix for pinning]
LTC
Connect to
LTC [see the appendix for pinning]
11.5 Connecting the power cables and power on
Power cables (redundant)
Connect the
ACs
K2 Edge automatically powers on when connected to a power source. To power on manually, press
the rotary knob. When powered on, the LCD panel illuminates.