beautypg.com

Installation, Frame capacity, Module placement in the 8900 frame – Grass Valley 8920DMX User Manual

Page 8

background image

8

8920DMX Instruction Manual

Installation

Installation

Installation of the 8920DMX module is a process of:

1.

Placing the module in the proper video frame slot, and

2.

Cabling and terminating signal ports.

The 8920DMX module can be plugged in and removed from an 8900 Series
video frame with power on. When power is applied to the module, LED
indicators reflect the initialization process (see

Power Up

on page 11

).

Frame Capacity

The 8920DMX module can be installed in all 8900 Series video frames but
with varying maximum quantities determined by frame cooling capacity.

Table 1

provides the power capacity, cooling capacity, and maximum

module count for each frame type.

Note

Module capacity figures assume no other modules are in the frame.

Module Placement in the 8900 Frame

There are ten slot locations in the 8900 Series video frame to accommodate
either analog or digital video modules. These are the left ten locations.
Refer to

Figure 1 on page 9

.

The two slots on the right are allocated for the power supplies. For addi-
tional information concerning the Power Supply module, refer to the

Gecko

8900 Series Frames Instruction Manual.

The third slot from the right is allocated for the Frame Monitor or 8900NET
Network Interface module. These modules provide health monitoring and
control options.

Table 1. Power, Cooling, and Module Capacity of 8900 Frames

Capacity Calculated

8900TX-V Frame

8900TF-V

Frame

8900TFN-V Frame

Power (W)

100

100

100

Recommended Module Cooling (W)

30

90

90

8920DMX Modules

6

10

10