Installation tools, Accessories provided with the router, User-supplied tools and equipment – H3C Technologies H3C MSR 930 User Manual
Page 10: Pre-installation checklist
3
Installation tools
Accessories provided with the router
•
Power cord
•
Console cable
•
Ring terminal
User-supplied tools and equipment
•
Phillips screwdriver
•
Flat-blade screwdriver
•
Wire-stripping pliers, needle-nose pliers
•
Screws with various specifications
•
Meters and equipment such as HUB, terminal, and multimeter
•
ESD-preventive gloves or wrist strap, ESD-preventive mat, anti-static bags
•
Electric drill (for wall-mounting the router)
•
Hammer
Pre-installation checklist
Table 4 Pre-installation checklist
Item Requirements
Yes No
Installation
site
Ventilation
•
There is a minimum clearance of 10 cm (3.9 in) around
the router chassis intake and exhaust vents for heat
dissipation.
•
The installation site ventilation system is adequate.
Temperature
0°C to 40°C (32°F to 104°F)
Relative humidity
5% to 90% (noncondensing)
Cleanness Dust
concentration
≤ 3 × 10
4
particles/m
3
ESD prevention
•
The equipment and floor are properly grounded.
•
The equipment room is dust-controlled.
•
Humidity and temperature are maintained at proper
levels.
•
Wear an ESD-preventive wrist strap when inspecting or
handling a circuit board.
EMI prevention
•
Take measures to protect the power system from the
power grid system.
•
Keep the protection ground of the router as far away
from the grounding device or lightning protection
grounding device as possible.
•
Keep the router far away from radio transmitters, radar,
and high-frequency or high-voltage devices.
•
Use electromagnetic shielding when necessary.