beautypg.com

Installation tools, Accessories provided with the router, User-supplied tools and equipment – H3C Technologies H3C MSR 930 User Manual

Page 10: Pre-installation checklist

background image

3

Installation tools

Accessories provided with the router

Power cord

Console cable

Ring terminal

User-supplied tools and equipment

Phillips screwdriver

Flat-blade screwdriver

Wire-stripping pliers, needle-nose pliers

Screws with various specifications

Meters and equipment such as HUB, terminal, and multimeter

ESD-preventive gloves or wrist strap, ESD-preventive mat, anti-static bags

Electric drill (for wall-mounting the router)

Hammer

Pre-installation checklist

Table 4 Pre-installation checklist

Item Requirements

Yes No

Installation
site

Ventilation

There is a minimum clearance of 10 cm (3.9 in) around

the router chassis intake and exhaust vents for heat
dissipation.

The installation site ventilation system is adequate.

Temperature

0°C to 40°C (32°F to 104°F)

Relative humidity

5% to 90% (noncondensing)

Cleanness Dust

concentration

≤ 3 × 10

4

particles/m

3

ESD prevention

The equipment and floor are properly grounded.

The equipment room is dust-controlled.

Humidity and temperature are maintained at proper

levels.

Wear an ESD-preventive wrist strap when inspecting or

handling a circuit board.

EMI prevention

Take measures to protect the power system from the

power grid system.

Keep the protection ground of the router as far away

from the grounding device or lightning protection

grounding device as possible.

Keep the router far away from radio transmitters, radar,

and high-frequency or high-voltage devices.

Use electromagnetic shielding when necessary.