Operation – Allmand Brothers NL PRO II User Manual
Page 47
47
OPERATION
OPERATION
2. Turn off the tower lights (if used).
3. Correct the excessive load problem and
wait 10 minutes, to allow the generator to
cool down before reconnecting the load.
Outlet Panel (240VAC 1 - Phase)
1
2
3
5
4
1. Main Outlet Panel 35A Circuit Breaker.
2. 30A Circuit Breaker - for 250VAC Outlet.
3. 250VAC Outlet.
4. 110VAC GFCI Outlet.
5. 20A Circuit Breaker (Push Button).
6. Grounding Lug - Connection to the
Ground Rod Lead.
6