Trailering, transporting and lifting, Always read and understand the instructions first – Allmand Brothers NL PRO II User Manual
Page 17
17
TRAILERING, TRANSPORTING AND LIFTING
After completing the pre-operation check list, operate the tower through a complete opera-
tion cycle, following the operating instructions in the NIGHT LITE PRO II Operator’s Manual.
Warning!
Unsafe operation Hazard. Never permit anyone to install or operate the equipment
without proper training.
ALWAYS READ AND UNDERSTAND THE INSTRUCTIONS FIRST.
Before trailering, transporting or lifting, read Safety on page 8.
The complete engine and generator set is housed in a lockable enclosure with the frame fabricated
from heavy gauge steel mounted on a two-wheel, leaf spring axle.
BEFORE TRAILERING OR TRANSPORTING
Perform the following before trailering / transporting:
Lower the light tower and shut down the tower lights and the engine; See Shutdown - prepare
for trailering on page 18.
Visually inspect the trailer and equipment for damage. Repair or replace any components as
needed before trailering.
Check the trailer lights for proper operation
Inspect the tires to insure good condition and proper inflation.
Inspect trailer springs and undercarriage for damage or loose parts.
Check the hitch assembly and safety chains.
Ensure the outriggers and jacks are properly stowed.
Ensure the ground rod and cable are disconnected and properly stowed.
Clean any spills from inside the trailer bilge area around the outside of the trailer; they may have
occurred during operation.
Ensure all compartment doors are closed and securely locked.