beautypg.com

AEC Single Conveying Units User Manual

Page 9

background image

XSV-05, XSV-05/R, & XSV-05/2R Single Conveying Units - Venturi Style

8 of 36

Check all lines, hoses, and coupling pieces regularly for leakage and
damage. Any errors must be eliminated immediately.

The unit may only be used if all corresponding components have been
properly connected and are in accordance with relevant regulations.

Observe the safety instructions for the connected units.

Maintenance Responsibility

Before beginning maintenance work:

Assign a supervisor.

Inform all other responsible operating personnel.

Turn off the main power supply.

Set all compressed air lines on the unit at zero pressure.

Repair work should ONLY be done by qualified personnel.

ALWAYS turn off the main supply for all electrical work to avoid risk of death

or injury.

NEVER operate on a unit that is partially disassembled. This can cause

serious injuries including amputation and electric shock.

• In case of functional disturbances, switch the unit off IMMEDIATELY. Any

errors must be eliminated to avoid accidents.