Verilink SCC 2020 (880-503268-001) Product Manual User Manual
Page 45

Configuration
Verilink SCC 2020 User Manual
3-23
1. Place the download file received from Verilink in a known path
on an FTP server.
2. Connect to the SCC 2020 directly or using Telnet.
3. At the
pSH+>
pSH+>
pSH+>
pSH+> prompt, issue the command to connect to the
FTP server, “FTP 192.94.45.229” (use the IP address of your
FTP server).
4. Navigate to the directory where the Verilink upgrade file is
located by using the “cd” command.
5. Set the transfer type to binary by typing “binary”.
6. Transfer the file to the SCC 2020 by typing “get myfile.ext” (use
the actual name of the file received from Verilink).
7. Now end the FTP session by typing “quit”.
8. At the
pSH+>
pSH+>
pSH+>
pSH+> prompt, type “craft” to enter the Craft interface.
9. Type “O” for the Node Administration Menu.
10. Type “Y” for the Element Download Menu.
The Element Download Menu is shown in
. The
commands presented are documented in
Figure 3-7
Element Download Menu
The commands used on the Element Download Menu will vary
according to:
•
The type of application module(s) you are upgrading.
•
The name of the file provided for the upgrade.
•
The shelf and slot location of the module(s).
•
Whether the module to be upgraded resides in the local node
or a remote location.
NOTE: For remote upgrade to work, the locations must be connected
with a T1 which has ESF framing and an uninterrupted
Facilities Data Link (FDL). In very many cases the T1 will be
---- element download ----
---- element download ----
---- element download ----
---- element download ----
T) element : ----
T) element : ----
T) element : ----
T) element : ----
F) file :
F) file :
F) file :
F) file :
S) shelf : 0 - 0
S) shelf : 0 - 0
S) shelf : 0 - 0
S) shelf : 0 - 0
L) slot : 0 - 0
L) slot : 0 - 0
L) slot : 0 - 0
L) slot : 0 - 0
D) dwnload
D) dwnload
D) dwnload
D) dwnload
X) exit menu
X) exit menu
X) exit menu
X) exit menu
[1,1] NEAR TAC 2010 >
[1,1] NEAR TAC 2010 >
[1,1] NEAR TAC 2010 >
[1,1] NEAR TAC 2010 >