Using heat baffles – Verilink Red Zone Encryption (REMS) (880-502423-001) Product Manual User Manual
Page 85

Multiple shelf rack-mount systems
Red Zone Encryption Management System (REMS) User Manual
9-3
Figure 9-2
System Mounting Dimensions
Each dual-line shelf and heat baffle also occupies one vertical mounting
space.
Using heat baffles
Heat baffles are mounted the same as dual-line shelves as shown in
Figur e9-2, System Mounting Dimensions. Use the same mounting
instructions described for the dual-line shelf, above.
For a rack consisting entirely of dual-line shelves, one heat baffle must be
placed between every two shelves, as shown in Figur e9-2, System
Mounting Dimensions.
If any equipment is to be mounted above two consecutively mounted
dual-line shelves, place a heat baffle between the equipment and the dual-
line shelf.
Instructions for
mounting a dual-
line shelf or heat
baffle
The dual-line has mounting ears attached to the middle of the shelf for
mid-mounting in a 19-inch (482.6 mm) rack. (See Figur e2-3, Example
Dual-line Shelf System.) The ears are detachable for front-mounting the
module.
To mount the dual-line shelf to the equipment rack:
1.
Place the dual-line shelf in an upright horizontal position.
2.
Hold the shelf from underneath and align the mounting screw holes
on the 19-inch (482.6 mm) mounting brackets.
1.75"
1.75"
1.75"
HEAT BAFFLE
DUAL-LINE SHELF
DUAL-LINE SHELF
1 Mounting
Space
HEAT BAFFLE
1.75"
Access System 2000
Access System 2000
DLS 2100
DLS 2100
(if required)
Slot 1
Slot 1