beautypg.com

Tubetrace, Tubing bundle field test report, Record 1: prior to installation – Thermon TubeTrace Tubing Bundles User Manual

Page 8: Record 2: after installation is complete, Record 3: commissioning / energized test values

background image

Customer:

Contractor:

Address:

Address:

Phone No:

Phone No.

Project

Reference:

Record 1: Prior to Installation

Bundle Model #:

Reel Length (indicate in m):

Reel

Number:

Insulation Resistance (m-Ohms):

Tested

By:

Date:

Witnessed

By:

Date:

Record 2: After Installation is Complete

Insulation Resistance (m-Ohms):

Heated Length* (indicate in m):

Circuit of Heater Number:

Tested

By:

Date:

Witnessed

By:

Date:

* Note, tubes may extend beyond tube bundle length.

Record 3: Commissioning / Energized Test Values

Electrical Control Panel Number:

Circuit Breaker Number:

Connected Voltage (Vac):

Ambient Temperature (deg. C):

Recorded Amps (After 5 Min.):

Tested

By:

Date:

Witnessed

By:

Date:

TubeTrace

®

Tubing Bundle Field Test Report

(Make additional copies as required for each circuit.)

Specifi cations and information subject to change without notice.

PN50035U-0811

THERMON . . . The Heat Tracing Specialists

®

www.thermon.com

Corporate Headquarters
100 Thermon Dr.

PO Box 609

San Marcos, TX 78667-0609

USA

Phone: +1 512-396-5801

European Headquarters
Boezemweg 25

PO Box 205

2640 AE Pijnacker

The Netherlands

Phone: +31 (0) 15-36 15 370

For the Thermon offi ce nearest you

visit us at . . .

www.thermon.com

This manual is related to the following products: