Accessories, Teejet tips) – Smithco Spray Star 3000 (sn 3500 – Current) Parts & Service Manual User Manual
Page 97
![background image](https://www.manualsdir.com/files/805379/content/doc097.png)
95
Accessories
14-101 PLUMBING & 709-420 NOZZLE KIT PARTS LIST
(TEEJET TIPS)
REF#
PART#
DESCRIPTION
QUANTITY
1
14-101
Boom
1
2
16-795
Square Clamp, 1
12
3
16-796
Diaphragm Check Valve, Single
(includes 8 & 9)
6
4
16-797
Diaphragm Check Valve, Double
(includes 8 & 9)
6
5
8888-19
Orange PVC Hose,
1
/
2
"
4
6
18-224
Hose Clamp
28
7
16-137
Fitting,
1
/
2
MPT x
1
/
2
HB
6
8
16-798
End Cap
12
9
16-960-06
Diaphragm
12
10*
16-802
Strainer
12
11*
16-800
Gasket
12
12*
16-803
Teejet Tip, XR8004, Standard
(all sizes available)
12
13*
16-804
Quick Teejet Cap
(white)
12
14
8888-8
Orange PVC hose,
1
/
2
6
15
16-200
Ball Valve,
1
/
4
FPT
2
16-136
Fitting,
1
/
4
MPT x
1
/
2
HB
4
16
8888-9
Orange PVC Hose,
1
/
2
"
4
17
16-135
Fitting,
1
/
2
MPT x
3
/
4
HB
3
18-077
Hose Clamp
3
*
709-420
Nozzle Kit
12 each
14-101 PLUMBING & 709-420 NOZZLE KIT INSTALLATION
(TEEJET TIPS)
All measurements are done from the fitting on center boom with booms in-line. Nozzles are exactly 20" apart.
1. Install check valves (A and B) behind the square tubing and pointing down.
A.
Single Ended Check Valve (Ref# 3) and Clamp (Ref# 2), install with fitting toward middle of boom.
B.
Double Ended Check Valve (Ref# 4) and Clamp (Ref# 2).
C.
Fitting (Ref# 17)
D.
Ball Valve and Fitting (Ref# 15)
2. Install strainer, gasket, nozzles into cap and connect to the check
valve. Strainers may be omitted if #XR8008, 8010, 8015 or 8020 nozzle
tips are used.
3. Place ball valve (D) between the outer check valves on both right and left
booms. Connect the check valves together using the
1
/
2
" hose and hose
clamps.
4. Fill the tank
1
/
2
full of water. Place unit on a hard and level surface.
Adjust boom height according to the Nozzle Selection Chart. Turn on
spray and observe the amount of overlapping spray between adjoining
nozzles. There should be 30% overlap. The edge of the spray from one
nozzle should reach approximate
1
/
3
of the way to the next nozzle. If
required, adjust boom height until the correct overlap is achieved.