INSTALLATION pLANNING

There are two basic types of direct vent
installation:
• Horizontal Termination
• Vertical Termination
Outside air flex installation is required for
both horizontal and vertical installation (see
page 13).

Horizontal Termination Installation

IMPORTANT: Horizontal square terminations
require only inner portion of wall firestop. Hori-
zontal installations using round termination
require exterior portion of wall firestop.

1. Set the fireplace in its desired location and

determine the route your horizontal vent-
ing will take. Do not secure the fireplace
until all venting has been installed. Some
installations require sliding the fireplace
in and out of position to make final vent-
ing connections. Figures 14 and 15 on
page 11 show different configurations for
venting with horizontal termination that
will help you decide which application
best suits your installation. Check to see
if wall studs or roof rafters are in the path
of your desired venting route. If they are,
you may want to adjust the location of the
fireplace.

2. Direct vent pipe sections and compo-

nents are designed with special twist-lock
connections.

Twist-Lock procedure: The female
ends of the pipes have locking lugs (in-
dentations). These lugs will slide straight
into matching slots on the male ends
of adjacent pipes. Push pipe sections
together and twist one section clockwise
approximately one-quarter turn until the
sections are fully locked (see Figure 8).
Note: Horizontal runs of vent must be sup-
ported every three feet. Use wall straps
for this purpose.

3. Assemble the desired combination of pipe

and elbows to the fireplace flue collar. If
there are long portions of venting run, pre-
assembled pipe sections may be installed
as subassemblies for convenience.

ventinG inStALLAtiOn

Continued

Figure 8 - Vent Pipe Connections

Female
Locking Lugs

Male
Slots

Figure 9 - Vent Opening Requirements

Center of
Hole

4. Carefully determine the location where

the vent pipe assembly will penetrate
the outside wall. The center of the hole
should line up with the center-line of the
horizontal vent pipe. Mark the wall for
an 11

1

/

2

" x 11

1

/

2

" square hole. Cut and

frame the square hole in the exterior
wall where the vent will be terminated. If
the wall being penetrated is constructed
of noncombustible material, such as
masonry block or concrete, a 8

1

/

2

" hole

with zero clearance is acceptable (see
Figure 9).

(Framing

Detail)

11

1

/

2

"

11

1

/

2

" Inside Framing

11

1

/

2

"

8

1

/

2

"

Vent Opening

Combustible Wall

Vent Opening