Seaward 50 PrimeTest User Manual
Page 13

PrimeTest 50
Operating Instructions
11
3.3
Testing a Class II Appliance
x
Visually inspect the appliance and mains cord for
signs of damage.
x
If the appliance passes a visual inspection
proceed with the electrical tests.
x
Plug the earth test lead into the 4mm socket
on the PrimeTest 50 end panel.
x
Plug the appliance into the PrimeTest 50 front
panel mains socket
x
Connect the earth test probe to an exposed
metal part on the appliance.
x
If the Appliance under test has an ON/OFF
switch, make sure it is in the ON position.
x
Press the Class II test key
x
The PrimeTest 50 will now test Insulation
Resistance.
Note: The power switch on the appliance under
must be in the ON position to perform an
insulation test. If no appliance is detected
the PrimeTest 50 will display the following.
6
1
3
- AGL-5 (2 pages)
- Apollo 500 (21 pages)
- B433R (16 pages)
- Checkbox 17 Plus (4 pages)
- Apollo 600 (32 pages)
- B255 (40 pages)
- A203ES (10 pages)
- A252 (35 pages)
- DO4000 (22 pages)
- DO5000 Interface (41 pages)
- DO5000 Series (36 pages)
- DO7e (24 pages)
- DP6 (22 pages)
- DO7010 (44 pages)
- ARE 1557 (31 pages)
- Europa Pac Plus (53 pages)
- Supernova Elite (118 pages)
- HAL Scan (164 pages)
- G2000 (44 pages)
- IRT 1557 (21 pages)
- KD1E (22 pages)
- LLT (2 pages)
- PAC3760 (2 pages)
- PAC 1500Xi (12 pages)
- PAC 1000 (10 pages)
- PAT2000i (29 pages)
- PATGuard Elite Quick start (2 pages)
- PATGuard Elite SQL Quick start (2 pages)
- PATGuard Pro 2 (77 pages)
- PATguard Pro 2 Quick start (2 pages)
- PATGuard Time Manager (12 pages)
- PATGuard Work About Quick start (4 pages)
- PH3 LLT (6 pages)
- PATGuard Work About (53 pages)
- Solar Power Clamp (31 pages)
- PowerGuard Pro (29 pages)
- PowerPlus 1557 (62 pages)
- PowerPlus PC (44 pages)
- 100 PrimeTest (24 pages)
- PATGuard 3 (153 pages)
- 200 PrimeTest (34 pages)
- 250 PrimeTest (48 pages)
- 220 PrimeTest (34 pages)
- RH9A Series (16 pages)