Seaward 50 PrimeTest User Manual
Page 12

PrimeTest 50
Operating Instructions
10
x
If the measured value is within acceptable limits
a tick is placed next the Earth Cont enunciator.
x
The unit will proceed with the Insulation test.
Note: The power switch on the appliance under
must be in the ON position to perform an
insulation test. If no appliance is detected
the PrimeTest 50 will display the following.
x
Check that the appliance power switch is in the
ON position. The test will automatically proceed
if the appliance power switch is placed in the ON
position.
x
If the Check Connections enunciator remains
on the display, the load presented by the
appliance may be too small for the PrimeTest 50
to detect. In this case, press the test key to
continue.
x
If the Insulation Resistance is greater than the
acceptable limit a tick is placed next to the
Insulation enunciator and the PASS enunciator
is illuminated.
2
- AGL-5 (2 pages)
- Apollo 500 (21 pages)
- B433R (16 pages)
- Checkbox 17 Plus (4 pages)
- Apollo 600 (32 pages)
- B255 (40 pages)
- A203ES (10 pages)
- A252 (35 pages)
- DO4000 (22 pages)
- DO5000 Interface (41 pages)
- DO5000 Series (36 pages)
- DO7e (24 pages)
- DP6 (22 pages)
- DO7010 (44 pages)
- ARE 1557 (31 pages)
- Europa Pac Plus (53 pages)
- Supernova Elite (118 pages)
- HAL Scan (164 pages)
- G2000 (44 pages)
- IRT 1557 (21 pages)
- KD1E (22 pages)
- LLT (2 pages)
- PAC3760 (2 pages)
- PAC 1500Xi (12 pages)
- PAC 1000 (10 pages)
- PAT2000i (29 pages)
- PATGuard Elite Quick start (2 pages)
- PATGuard Elite SQL Quick start (2 pages)
- PATGuard Pro 2 (77 pages)
- PATguard Pro 2 Quick start (2 pages)
- PATGuard Time Manager (12 pages)
- PATGuard Work About Quick start (4 pages)
- PH3 LLT (6 pages)
- PATGuard Work About (53 pages)
- Solar Power Clamp (31 pages)
- PowerGuard Pro (29 pages)
- PowerPlus 1557 (62 pages)
- PowerPlus PC (44 pages)
- 100 PrimeTest (24 pages)
- PATGuard 3 (153 pages)
- 200 PrimeTest (34 pages)
- 250 PrimeTest (48 pages)
- 220 PrimeTest (34 pages)
- RH9A Series (16 pages)