After Utility Connections

1. Wash out the bin. If desired, the interior of the
bin could be sanitized.

2. Locate the ice scoop (if supplied) and have it
available for use when needed.

3. Switch on the electrical power. Do not start the
machine for 4 hours.

4. Go thru the final check list (below).

Final Check List:

___ 1.

Is the unit located indoors in a controlled

environment?

___ 2.

Has the correct remote condenser been

properly located and mounted?

___ 3.

Has the correct electrical power (voltage

and phase) been supplied to the
machine?

___ 4.

Have all the water supply connections

been properly made with the correct size
tubing?

___ 5.

Have all the drain connections been

properly made?

___ 6.

Has the unit been leveled? Level the unit

at the bin.

___ 7.

Have all unpacking materials been

removed?

___ 8.

Is the water pressure adequate?

___ 9.

Is the machine secured to the ice storage

bin?

___ 10. Is the bin control system been properly

installed?

___ 11. Have the drain connections been checked

for leaks?

___ 12. Has the bin interior been wiped clean or

sanitized?

___ 13. Have any water filter cartridges been

replaced?

___ 14. Check all refrigerant lines and conduit

lines, for vibration or rubbing and possible
failure. Adjust as needed.

___ 15. After 4 hours of electrical power, proceed

to Initial Start Up.