beautypg.com

Scotsman Prodigy Plus D Series User Manual

Page 14

background image

C0322 through C1030 D Series

Air and Water Cooled User Manual

December 2014

Page 13

Final Check List

After connections,

1. Wash out the bin. If desired, the interior of the bin

could be sanitized.

2. Locate the ice scoop (if supplied) and have it

available for use when needed.

Final Check List:

1. Is the unit located indoors in a controlled

environment?

2. Is the unit located where it can receive adequate

cooling air?

3. Has the correct electrical power been supplied to

the machine?

4. Have all the water supply connections been

made?

5. Have all the drain connections been made?

6. Has the unit been leveled?

7. Have all unpacking materials and tape been

removed??

8. Is the water pressure adequate?

9. Have the drain connections been checked for

leaks?

10. Has the bin interior been wiped clean or sanitized?

11. Have any water filter cartridges been replaced?

12. Have all required kits and adapters been properly

installed?

Lower Light and Switch Panel

This user accessible panel provides important

operational information and duplicates the lights and

switches on the controller. It also allows access to

the On and Off buttons that operate the ice machine.

Sometimes access to the switches should be limited

to prevent unauthorized operation. For that purpose

a fixed panel is shipped in the hardware package.

The fixed panel cannot be opened.

To install the fixed panel:

1. Remove the front panel and remove the bezel.

2. Spread the bezel frame open and remove

original door, insert fixed panel into bezel. Be

sure it is in the closed position.

3. Return bezel to panel and install panel on unit.

Open door to access On

and Off switch buttons.