Tightness check – REMKO RVT 261 DC User Manual
Page 21
Supplementary information
for installation
■
When combining the outdoor
component with some indoor
units, the connection of the
refrigerant pipes may differ. In
that case, install the provided
reducer or expansion fittings to
the indoor unit.
■
If the basic length of the
refrigerant pipe exceeds
5 m, add refrigerant when
commissioning the system for
the first time. (See chapter
"Add refrigerant").
12. Ensure that structure-borne
sound is not transferred to parts
of the building. Use vibration
dampers to reduce the effects
of structure-borne sound!
13. Prepare the refrigerant pipe
for the outdoor component as
described above.
A vacuum of min. 20 mbar
must be created!
CAUTION
The time required to generate
the vacuum is dependent on
the pipework volume of the
indoor unit and the length of the
refrigerant pipes. This always takes
at least 60 minutes.
Once any foreign gases and
humidity have been completely
extracted from the system, the
valves on the pressure gauge
station are closed and the valves
on the outdoor component are
opened as described in the chapter
on "Commissioning".
Tightness check
Once all the connections have
been established, the pressure
gauge station is attached as
follows to the Schrader valve (if
fitted):
red = small valve
= injection pressure
blue = large valve
= suction pressure
Once connected, perform a
tightness test using dried nitrogen.
The tightness test involves
spraying a leak detection spray
onto the connections. If bubbles
are visible, the connections have
not been properly made. Re-
tighten the connection or prepare
a new flange.
If the tightness test is successfully
completed, depressurise the
refrigerant pipes and start a
vacuum pump with an absolute
final partial pressure of min.
10 mbar to remove the air in the
pipe. Any humidity present in the
pipes is also removed.
21