background image

Functional test for
cooling mode.

1. Switch the supply voltage on.

2. Use the remote control to turn

on the unit and select the cool-
ing mode, maximum fan speed
and lowest nominal tempera-
ture.

Commissioning

Commissioning should only be
performed by specially trained
personnel and documented
after the certificate has been
issued.

Observe the manuals for the
indoor unit and outdoor unit
when commissioning the en-
tire system.

NOTE

Check the DIP switch settings
on the PCB, as illustrated on
Page 22.
If necessary, set the DIP
switches to the appropriate
indoor unit type.

NOTE

Functional test for
heating mode.

1. Switch the supply voltage on.

2. Use the remote control to

switch on the unit and select
the heating mode, maximum
fan speed and highest nominal
temperature.

Final tasks

Reassemble all disassembled
parts.

Familiarise the operator with
the system.

3. Measure and record all the

required values in the commis-
sioning report and check the
safety functions.

4. Check the control system for

the unit using the functions
described in the chapter "Opera-
tion". Timer, temperature setting,
fan speeds and changing to air
circulation or dehumidifying
mode.

5. Check the correct function of the

condensation line by pouring
distilled water into the conden-
sation tray.
A bottle with a spout is recom-
mended for pouring the water
into the condensation tray.

3. Measure and record all the

required values in the commis-
sioning report and check the
safety functions.

4. Measure the air intake tem-

perature of the ceiling mounted
cassette and the room tempera-
ture approx. 1.5 m above the
floor. In the event of deviation,
correct any temperature dif-
ference by means of the DIP
switch SW1 (s.S22).

5. Check the control system for

the unit using the functions
described in the chapter "Op-
eration".
Timer, temperature setting, fan
speeds.

Check that the stop valves
and valve caps are tight after
carrying out any work on the
refrigerant circuit. Use ap-
propriate sealant products as
necessary.

NOTE

23

650

650

400

620

28

580

MXD 200-520 IT

Unit dimensions

255

580

This manual is related to the following products: