beautypg.com

Start up checklists – Nortec NH Series User Manual

Page 60

background image

57 | Troubleshooting

Start Up Checklists

NHRS Electric Steam Humidifier – Mandatory Pre-Start-Up Checklist (p1 of 3)

Unit Serial #: ____________ # of humidifiers: ____________

Tag:_____________


Unit type: NHRS

Voltage: _____V/___ph

Steam output: ____lbs./hr


Customer/Job:_______________

Address: ____________________________________________________________________

Inspected by: ____________ Date of inspection: ___/___/___

WATER QUALITY:

Well water



City water



Softened water



Conductivity: _______mhmos

Hardness: _____gr.

Silica____ppm

HUMIDIFIER MOUNTING:

Clearances around the unit:

Acceptable

Obstruction

Front (door opens freely?)

3ft min



__________________

Top (steam lines)

1ft min



____________________

Bottom (fill, drain, controls)

1ft min



____________________

Right (main pwr)

3ft min

____________________

Left (main pwr)

2” min



____________________

Ensure the scale tank bracket is locked in place


STEAM LINES: CONDENSATE LINES:

Slope up 2” per 12”



Slopped back to drain

Slope down ½” per 12”



Trapped 2” more than static duct pressure

Traps

Size _______

Insulated

Length/Size ____________

90º elbows qty: ____ 45 deg. Elbows qty: ____

Can condensate be trapped anywhere in the steam line? Yes

no




WATER LINES:

½” at max 4ft from the unit -3/8” connection at fill

Water pressure: 30-80psig