Start up checklists – Nortec NH Series User Manual
Page 60
57 | Troubleshooting
Start Up Checklists
NHRS Electric Steam Humidifier – Mandatory Pre-Start-Up Checklist (p1 of 3)
Unit Serial #: ____________ # of humidifiers: ____________
Tag:_____________
Unit type: NHRS
Voltage: _____V/___ph
Steam output: ____lbs./hr
Customer/Job:_______________
Address: ____________________________________________________________________
Inspected by: ____________ Date of inspection: ___/___/___
WATER QUALITY:
Well water
City water
Softened water
Conductivity: _______mhmos
Hardness: _____gr.
Silica____ppm
HUMIDIFIER MOUNTING:
Clearances around the unit:
Acceptable
Obstruction
Front (door opens freely?)
3ft min
__________________
Top (steam lines)
1ft min
____________________
Bottom (fill, drain, controls)
1ft min
____________________
Right (main pwr)
3ft min
____________________
Left (main pwr)
2” min
____________________
Ensure the scale tank bracket is locked in place
STEAM LINES: CONDENSATE LINES:
Slope up 2” per 12”
Slopped back to drain
Slope down ½” per 12”
Trapped 2” more than static duct pressure
Traps
Size _______
Insulated
Length/Size ____________
90º elbows qty: ____ 45 deg. Elbows qty: ____
Can condensate be trapped anywhere in the steam line? Yes
no
WATER LINES:
½” at max 4ft from the unit -3/8” connection at fill
Water pressure: 30-80psig