Receiving and unpacking – Nortec NH Series User Manual
Page 5
Introduction | 2
Receiving and Unpacking
1 Check packing slip to ensure ALL material has been delivered.
2 All material shortages are to be reported to NORTEC within 48 hours from receipt of goods.
NORTEC assumes no responsibility for any material shortages beyond this period.
3 Inspect shipping boxes for damage and note damages on shipping waybill accordingly.
4 After unpacking, inspect equipment for damage. If damage is found, notify the shipper
promptly.
5 All NORTEC products are shipped on a Free-On-Board (FOB) factory basis. Any and all
damage, breakage or loss claims are to be made directly to the shipping company.
Before Installation
1 Ensure that available voltage and phase corresponds with humidifier voltage and phase as
indicated on humidifier specification label.
2 Ensure that the dedicated external fuse disconnect is of sufficient size to handle the rated
amps as indicated on the specification label. Refer to local codes.
3 Report any discrepancy immediately to the site engineer.
4 Ensure sufficient clearances will be available as described on pages 10 and 11.
5 Ensure steam lines can be routed to distributor or blower pack as described on pages 14-19
and 31.
Figure 1: Specification Label Location