Section 5: wiring, Installing the fireplace control box, Installation – Montigo R320-ST User Manual
Page 17
R320-ST & R420-ST Power Vent Indoor Gas Fireplace
Page 17
XG0774 - 150121
Installation
Section 5: Wiring
Figure 1 Sec.5 R320ST* / R420ST* Series Control Box / Power Vent
Wire Routing Diagram
Installing the Fireplace Control Box
Install the Fireplace Control Box in an accessible location. The
location should be where maintenance, adjustments and service
may be made easily.
Control
Box
Horizontal
Power Vent
Termination
Vertical
Power Vent
Termination
Power cable Installation
required for either Horizontal
or Vertical Termination Vent
115Vac 60 Hz
supply from
Distribution Panel
Wall Switch
Power
Vent
20 foot control
cable to fireplace
(standard)