beautypg.com

Section 3-3, Installing a wall mounted direct vent, Termination (5"/10") – Montigo P52DF User Manual

Page 12: Installation

background image

Page 12

P52DF* Indoor Gas Fireplace

XG0196 - 150204.3

Installation

Section 3-3:

Installing a Wall Mounted Direct

Vent Termination (5"/10")

This section applies to installations where the direct vent

termination will be wall mounted with 5" and 10" pipe.

1). Installation of Termination with built in frame under 8'

from the top of the unit.
A Termination with a Built-In Frame is installed during

framing of a structure.

1. Frame the termination opening to 17" x 17".
2. Install exterior sheathing to the structure framing.
3. Fasten the termination to the sheathing using a minimum of

4 screws.

RTO-4F (5"/10")

Termination

Figure 9. Installing a RTO-4F termination.

RTKOG (5"/10")

Installing Heat Guards over Terminations is recommended

in installations where the termination is located within 7'

feet above grade, or above a pedestrian walkway, and may

be Required by code in Public areas.

1. Ensure that the two

long mounting brackets are facing

the bottom of the termination. (See inset). This will

provide more heat protection at the top of the termination,

where temperatures are highest.

2. Attach to the faceplate of the termination using four

sheet metal screws.

Figure 9a. Installing a RTO termination heat guard.

Framing

Exterior

Sheathing

Fastening Hardware,

minimum 4-screws

17

17”

RHS 104
(Not shown)

Section 3-3-1: Installing a Wall Mounted Direct

Vent Termination (5"/8")

This section applies to installations where the direct vent

termination will be wall mounted with 5" and 8" pipe.

1). Installation of Termination with built in frame above 8'

from the top of the unit.
A Termination with a Built-In Frame is installed during

framing of a structure.

1. Frame the termination opening to 14" x 14".
2. Install exterior sheathing to the structure framing.
3. Fasten the termination to the sheathing using a minimum of

4 screws.

PTO-4F (5"/8")

Termination

Figure 10b. Installing a RTO-4F termination.

MTKOG (5"/8")

Installing Heat Guards over Terminations is recommended

in installations where the termination is located within 7'

feet above grade, or above a pedestrian walkway, and may

be Required by code in Public areas.

1. Ensure that the two

long mounting brackets are facing

the bottom of the termination. (See inset). This will

provide more heat protection at the top of the termination,

where temperatures are highest.

2. Attach to the faceplate of the termination using four

sheet metal screws.

Figure 10c. Installing a RTO termination heat guard.

Framing

Exterior

Sheathing

Fastening Hardware,

minimum 4-screws

RHS 101
(Not shown)

14

14”