Section 3-3, Installing a wall mounted direct vent, Termination (5"/10") – Montigo P52DF User Manual
Page 12: Installation
Page 12
P52DF* Indoor Gas Fireplace
XG0196 - 150204.3
Installation
Section 3-3:
Installing a Wall Mounted Direct
Vent Termination (5"/10")
This section applies to installations where the direct vent
termination will be wall mounted with 5" and 10" pipe.
1). Installation of Termination with built in frame under 8'
from the top of the unit.
A Termination with a Built-In Frame is installed during
framing of a structure.
1. Frame the termination opening to 17" x 17".
2. Install exterior sheathing to the structure framing.
3. Fasten the termination to the sheathing using a minimum of
4 screws.
RTO-4F (5"/10")
Termination
Figure 9. Installing a RTO-4F termination.
RTKOG (5"/10")
Installing Heat Guards over Terminations is recommended
in installations where the termination is located within 7'
feet above grade, or above a pedestrian walkway, and may
be Required by code in Public areas.
1. Ensure that the two
long mounting brackets are facing
the bottom of the termination. (See inset). This will
provide more heat protection at the top of the termination,
where temperatures are highest.
2. Attach to the faceplate of the termination using four
sheet metal screws.
Figure 9a. Installing a RTO termination heat guard.
Framing
Exterior
Sheathing
Fastening Hardware,
minimum 4-screws
”
17
17”
RHS 104
(Not shown)
Section 3-3-1: Installing a Wall Mounted Direct
Vent Termination (5"/8")
This section applies to installations where the direct vent
termination will be wall mounted with 5" and 8" pipe.
1). Installation of Termination with built in frame above 8'
from the top of the unit.
A Termination with a Built-In Frame is installed during
framing of a structure.
1. Frame the termination opening to 14" x 14".
2. Install exterior sheathing to the structure framing.
3. Fasten the termination to the sheathing using a minimum of
4 screws.
PTO-4F (5"/8")
Termination
Figure 10b. Installing a RTO-4F termination.
MTKOG (5"/8")
Installing Heat Guards over Terminations is recommended
in installations where the termination is located within 7'
feet above grade, or above a pedestrian walkway, and may
be Required by code in Public areas.
1. Ensure that the two
long mounting brackets are facing
the bottom of the termination. (See inset). This will
provide more heat protection at the top of the termination,
where temperatures are highest.
2. Attach to the faceplate of the termination using four
sheet metal screws.
Figure 10c. Installing a RTO termination heat guard.
Framing
Exterior
Sheathing
Fastening Hardware,
minimum 4-screws
RHS 101
(Not shown)
”
14
14”