8 operational qualification summary report – K-Patents PR-23 for K-Patents Appendix User Manual
Page 47

Onsite Qualification Protocols and Records: Operational Qualification
7
© Copyright K-Patents 2013. All rights reserved.
47
7.8 Operational Qualification Summary Report
Successful completion of the preceding activities and checks indicates that this instrument
performs satisfactorily. The Operational Qualification has been accepted.
OQ completed by
Name:
Function:
Date:
Signature:
Signature:
OQ deviations approved by
Name:
Function:
Date:
Signature:
Signature:
OQ approved by
Name:
Function:
Date:
Signature:
Signature: