7 setting up the system components and devices – K-Patents PR-23 for K-Patents Appendix User Manual
Page 38

Document/Revision No. IM-GB-PR23-VACCINES: Rev. 1.01 Effective: November 1, 2013
38
Appendix to the Instructions Manual PR-23
6.7 Setting up the system components and devices
Description of requirements
The Pharma Refractometer system with Refractometer sensor, Pharma mini flow cell and
Indicating transmitter, are assembled and mounted correctly as described in the
3 (this document). Also the ancillary sample system is connected in accordance with the
Section 3 (this document). The ancillary equipment is switched on in accordance with the
corresponding operating manuals.
Requirement acceptance values
The system and devices are complete and have been set up in compliance with
the instructions.
Failure to meet the acceptance values
Terminate the IQ.
Date
Signature
Pass
*
Conditional Pass
Fail
*Conditional pass: