7 setting up the system components and devices – K-Patents PR-23 for K-Patents Appendix User Manual

Page 38

background image

Document/Revision No. IM-GB-PR23-VACCINES: Rev. 1.01 Effective: November 1, 2013

38

Appendix to the Instructions Manual PR-23

6.7 Setting up the system components and devices

Description of requirements
The Pharma Refractometer system with Refractometer sensor, Pharma mini flow cell and
Indicating transmitter, are assembled and mounted correctly as described in the

Section

3 (this document). Also the ancillary sample system is connected in accordance with the
Section 3 (this document). The ancillary equipment is switched on in accordance with the
corresponding operating manuals.

Requirement acceptance values
The system and devices are complete and have been set up in compliance with
the instructions.

Failure to meet the acceptance values
Terminate the IQ.

Date

Signature

Pass

*

Conditional Pass

Fail

*Conditional pass: