beautypg.com

12 installation qualification summary report – K-Patents PR-23 for K-Patents Appendix User Manual

Page 42

background image

Document/Revision No. IM-GB-PR23-VACCINES: Rev. 1.01 Effective: November 1, 2013

42

Appendix to the Instructions Manual PR-23

6.12 Installation Qualification Summary Report

Successful completion of the preceding activities and checks indicates that this instrument
has been satisfactorily delivered and installed. This instrument has passed the Installation
Qualification and may now be submitted for Operational Qualification.

IQ completed by

Name:

Function:

Date:

Signature:

Signature:

IQ deviations approved by

Name:

Function:

Date:

Signature:

Signature:

IQ approved by

Name:

Function:

Date:

Signature:

Signature:

Comments (including discrepancies)