beautypg.com

Pressing – Ivoclar Vivadent IPS Empress Esthetic User Manual

Page 28

background image

EP 600/EP 600 Combi
Small and large investment ring

B

700°C

1292°F

t

60°C

108°F

T

1075°C

1967°F

H

20’

V

1

500°C

932°F

V

2

1075°C

1967°F

A

250 µm

28

Pressing

Before the preheating cycle for the investment ring has ended, the following preparations for pressing must be carried out:

– Switch on the press furnace in time to ensure that the self-test and preheating phase are completed.

– Select the press program for IPS Empress Esthetic and the respective investment ring size (EP 600/EP 600 Combi).

– Place the ingots and AlOx plungers in the investment ring and position it quickly (in less than 1 min.) in the furnace.

– Do not use the IPS e.max AlOx Plunger Separator. The press temperature of the IPS Empress Esthetic ingots of 1075 °C/

1967 °F is too high for the separator to be effective.

Once the preheating cycle has been completed, remove the investment ring from the preheating furnace and proceed as

follows:

– Place the

hot

IPS Empress Esthetic ingot – in the required shade of the tooth (see material combination table) – into the

hot

investment ring.

– Place the

hot

AlOx plunger into the

hot

investment ring.

– Place the completed investment ring central the

hot

press furnace.

– Press START to start the selected program.

Number of ingots

IPS Empress Esthetic Ingots

IPS Empress Alox-Kolben

100 g investment ring

max. 1 ingot

hot ingot

hot plunger

200 g investment ring

max. 2 ingots

hot ingot

hot plunger

Place the

hot

IPS Empress Esthetic ingot in the investment ring.

Place the

hot

AlOx plunger into the investment ring.

Press parameters for the IPS Empress Esthetic Ingots

EP 500
Small and large investment ring

B

700°C

1292°F

t

60°C

108°F

T

1075°C

1967°F

H

20’

V

1

500°C

932°F

V

2

1075°C

1967°F

Pressure

5 bar