Gang mounting bracket configuration, Typical installation heights – FSR FL-600P User Manual
Page 2

GANG MOUNTING BRACKET CONFIGURATION
PER CUSTOMER SPECIFICATIONS, CONFIGURE GANG MOUNTING BRACKETS AS
SHOWN BELOW AND REASSEMBLE INTO BOX.
REMOVABLE LARGE CENTER DIVIDER
REMOVABLE SMALL CENTER DIVIDER
REMOVABLE SMALL CENTER DIVIDER
REMOVABLE LARGE CENTER DIVIDER
CENTER DIVIDER CONFIGURATION (NOT APPLICABLE ON 4" BOX)
SET ASIDE TEMPORARY COVER AND SCREWS FOR POSSIBLE RE-INSTALLATION.
REMOVE AND RETAIN GANG MOUNTING BRACKETS AND SCREWS TO CONFIGURE
CENTER DIVIDERS.
TYPICAL INSTALLATION HEIGHTS
WOOD WITH OR WITHOUT SLEEPER SYSTEM OVER CONCRETE (COVER WITH EDGING)
H
TEMPORARY COVER
FLOOR BOX
CONCRETE
TH
H
E
CONCRETE
FLOOR BOX
FINISH COVER
EDGING
WOOD
H (BASED ON ASSEMBLY THICKNESS) =
TH (TOTAL ASSEMBLY HEIGHT) - E (EDGING HEIGHT)
WOOD WITH OR WITHOUT SLEEPER SYSTEM OVER CONCRETE (COVER WITHOUT EDGING)
H
H = ASSEMBLY THICKNESS
TEMPORARY COVER
FLOOR BOX
CONCRETE
WOOD
CONCRETE
FLOOR BOX
FINISH COVER
VINYL FLOORING OVER CONCRETE (COVER WITHOUT EDGING)
H
CONCRETE
TEMPORARY COVER
FLOOR BOX
CONCRETE
FLOOR BOX
FINISH COVER
VINYL FLOORING
SLEEPER
SYSTEM
(IF USED)
SLEEPER
SYSTEM
(IF USED)
VERIFY PER
SPECIFICATION
OR ORDER
POSSIBLE GANG DIVIDER LOCATION
"5 GANG SIDE" MOUNTING BRACKET CONFIGURATIONS
5 OR 6 GANG MOUNTING PLATE
DIVIDER HOLDER
OPTIONAL DIVIDER
LARGE GAP FILLER
SMALL GAP FILLER
"6 GANG SIDE" MOUNTING BRACKET CONFIGURATIONS
1G
1G
2G
1G
1G
3G
1G
3G
1G
1G
4G
2G
2G
2G
3G
4G
1G
5G
1G
3G
1G
3G
2G
2G
2G
2G
1G
4G
2G
3G
3G
1G
2G
2G
3G
2G
4G
1G
6G
"6 GANG SIDE"
"5 GANG SIDE"
5 GANG SIDE
6 GANG SIDE