Gang mounting bracket configuration, Typical installation heights – FSR FL-500P User Manual
Page 2

1-GANG/2-GANG CONFIGURATION
1-GANG/3-GANG CONFIGURATION
2-GANG/2-GANG CONFIGURATION
3-GANG/1-GANG CONFIGURATION
4-GANG CONFIGURATION
GANG MOUNTING BRACKET CONFIGURATION
PER CUSTOMER SPECIFICATIONS, CONFIGURE GANG MOUNTING BRACKETS AS SHOWN BELOW AND
REASSEMBLE INTO BOX (DECORA WALL PLATES SHOWN AS REFERENCE AND NOT INCLUDED).
COVER PLATE
GANG
MOUNTING
BRACKET
OPTIONAL DIVIDER
GANG
MOUNTING
BRACKET
OPTIONAL DIVIDER
GANG MOUNTING BRACKET
OPTIONAL
DIVIDER
GANG MOUNTING BRACKET
OPTIONAL DIVIDER
DIVIDER
HOLDER
DIVIDER
HOLDER
DIVIDER
HOLDER
(2) DIVIDER
HOLDER
GANG MOUNTING BRACKET
(2) DIVIDER HOLDER
(NO DIVIDERS USED)
REMOVABLE LARGE CENTER DIVIDER
REMOVABLE SMALL
CENTER DIVIDER
REMOVABLE SMALL
CENTER DIVIDER
REMOVABLE LARGE CENTER DIVIDER
CENTER DIVIDER CONFIGURATION (NOT APPLICABLE ON 4" BOX)
SET ASIDE TEMPORARY COVER AND SCREWS FOR POSSIBLE RE-INSTALLATION.
REMOVE AND RETAIN GANG MOUNTING BRACKETS AND SCREWS TO CONFIGURE
CENTER DIVIDERS.
TYPICAL INSTALLATION HEIGHTS
WOOD WITH OR WITHOUT SLEEPER SYSTEM OVER CONCRETE (COVER WITH EDGING)
H
TEMPORARY COVER
FLOOR BOX
CONCRETE
TH
H
E
CONCRETE
FLOOR BOX
FINISH COVER
EDGING
WOOD
H (BASED ON ASSEMBLY THICKNESS) =
TH (TOTAL ASSEMBLY HEIGHT) - E (EDGING HEIGHT)
WOOD WITH OR WITHOUT SLEEPER SYSTEM OVER CONCRETE (COVER WITHOUT EDGING)
H
H = ASSEMBLY THICKNESS
TEMPORARY COVER
FLOOR BOX
CONCRETE
WOOD
CONCRETE
FLOOR BOX
FINISH COVER
VINYL FLOORING OVER CONCRETE (COVER WITHOUT EDGING)
H
CONCRETE
TEMPORARY COVER
FLOOR BOX
CONCRETE
FLOOR BOX
FINISH COVER
VINYL FLOORING
SLEEPER
SYSTEM
(IF USED)
SLEEPER
SYSTEM
(IF USED)
VERIFY PER
SPECIFICATION
OR ORDER
POSSIBLE GANG DIVIDER LOCATION
BOTH GANG MOUNTING BRACKETS ARE IDENTICAL, AS IS THEIR CONFIGURATION CAPABILITY